Mossy1985
VIP REGULAR
I wonder why they worked all the front off like that first. I would have left rigging points on the front to take the back down in bigger sections. Looks like they’ve got all the right equipment. With all that equipment that should have been an 8 to 10 hour job not counting grinding the stump.